          電蒸汽鍋爐安裝過程中掌握平衡的方法?

          由于電蒸汽鍋爐http://www.officechairs.com.cn/等大型鍋爐一般用于工業生產或者是工業用水的熱交換設備,體積一般比家用蒸汽鍋爐體積較大,所以在安裝過程中掌握平衡的問題就擺在了用戶的面前,那么蒸汽鍋爐在安裝過程中如何掌握平衡?

          大型蒸汽鍋爐在安裝過程中保持左右平衡的方法可以從縱向、橫向兩方面入手,輕松幫您的蒸汽鍋爐找平。
          Large steam boiler maintain about balancing methods during the installation process from vertical, horizontal two-pronged approach to help you easily steam boiler leveling.

          電蒸汽鍋爐http://www.officechairs.com.cn/在南北方向找平的方法:先找到水平尺長不小于600毫米的尺子,將尺子水平放在蒸汽鍋爐爐排的縱排面上,治愈爐排前后兩處,要求爐排面縱向應水平或爐排面略坡向爐膛后部這樣可以很輕松的檢查到爐排面的縱向水平度。最大傾斜度小于等于10毫米.當蒸汽鍋爐縱向不平時,可用千斤頂將過低的一端頂起,在蒸汽鍋爐的支架下墊以適當厚度的鋼板,使蒸汽鍋爐的水平度達到要求。墊鐵的間距一般為500~1000mm。
          Electric steam boiler in north-south direction leveling approach: first find a ruler-foot level of not less than 600 mm long, and the ruler placed horizontally on a vertical surface of a steam boiler drain grate, grate heal around two, require longitudinal grate surface should horizontal or grate furnace rear surface slope slightly so you can easily check the level of the grate longitudinal plane. The maximum gradient of 10 mm or less. When the steam boiler is not the usual portrait, can jack the low end of the top, in the steam boiler underlying stent to the proper thickness steel plate, so that the level of the steam boilers meet the requirements. Pitch horn is generally 500 ~ 1000mm.

          電蒸汽鍋爐http://www.officechairs.com.cn/在東西方向找平的方法:先找到水平尺長不小于600毫米的尺子,將尺子水平放在蒸汽鍋爐爐排的橫排面上,治愈爐排前后兩處,爐排的橫向傾斜度不得大于5mm(爐排的橫向傾斜過大會導致爐排跑偏)。當爐排橫向不平時,用千斤頂將蒸汽鍋爐一側支架同時頂起,在支架下墊以適當厚度的鋼板,墊鐵的間距一般為500~1000mm。
          Electric steam boilers in east-west direction leveling approach: first find a ruler-foot level of not less than 600 mm long, and the horizontal ruler placed horizontally on the surface of a steam boiler grate, cure around the grate two lateral inclination grate no larger than 5mm (lateral tilting grate grate over the General Assembly lead to deviation). When the grate laterally peacetime,the steam boiler with a jack from the top side of the bracket at the same time, the underlying stent to the proper thickness steel plate, horn spacing is generally 500 ~ 1000mm.

           


          下一篇:電蒸汽鍋爐結焦如何處理?
          上一篇:清除電蒸汽鍋爐水垢的幾種方法

          熱門產品推薦

          主站蜘蛛池模板: 国内精品久久久久久tv| 男女裸交免费无遮挡全过程| 亚洲精品55夜色66夜色| 青青草99久久精品国产综合| 婷婷亚洲久悠悠色悠在线播放| 亚洲 自拍 欧美 小说 综合| 国产精品久久久久电影院| 国产成人av无码永久免费一线天| 欧美精品色婷婷五月综合| 亚洲午夜久久久影院| 国产精品日日做人人爱| 女人高潮内射99精品| 日亚韩在线无码一区二区三区| 女人被做到高潮免费视频| 国产成av人片在线观看无码| 久久午夜神器| 国产手机在线亚洲精品观看| 国产精品久久久久久亚洲影视| 少妇午夜福利一区二区| 午夜福利yw在线观看2020 | 日韩欧美在线观看一区二区视频| 亚洲人成色77777在线观看大战p| 成人片国产精品亚洲| 国内精品久久久久影院蜜芽| 久久99国产精品二区| 久久国产精久久精产国| 亚洲精品国产第一区第二| 无码纯肉动漫在线观看| 又大又长粗又爽又黄少妇毛片| 久久99国产精品二区| 亚洲va中文字幕不卡无码| 亚洲精品美女久久久久久久| 在线播放亚洲人成电影| 久久久久青草线蕉亚洲| 精品国产一区二区三区吸毒| 在线天堂资源www在线中文| 国产精品一区二区含羞草| 7777精品伊久久久大香线蕉| 久久婷婷五月综合色高清| 人妻 色综合网站| 动漫精品视频一区二区三区|